Hi Friends,
I have enhaced 2LIS_11_VAITM with the new field ZZTXT today in ECC. This dataSource is already in Prodution and have delta setup. This delta will trigger through process chain daily.
I have a question now, the requirement is to create new DSO and load the historical data for this new enhanced filed till DSO layer and setup delta in ECC side. I have to do this without disturbing my existing delta in production.
Please suggest me the soultion
Summerising the Question: I have the enhanced datasource with the new field, I want to move this development to production, in production the delta load is already in progress. Now I want to load the new enhanced field to new dat flow in BI
Thanks and Regards.
Santhosh