Hello All,
we had a situation where the ECC and BW master data (already scheduled in process chains for Delta) is not matching.
Doe some Profit centres Texts and Attributes are not correctly updated in BW.
To do that what I suggested (after a long check) as a quick fix is to Reload the data into 0Profit_ctr and 0Costcenter as I was in an impression that the sometime the PSA did not get updated properly and the PSA request is deleted. This was happening in Production.
I want to know clear steps how to handle this please.
Before doing a Full Load shall we need to delete data from 0Profit_CTR ?
Or Shall we need to keep the data and Do a full Repair Load and then continue with the Delta process chains ?
Kindly help.
Thanks
Krishna