0FI_GL_10 delta load failing

$
0
0

Hi,

 

My Delta load chain for 0fi_gl_10 is failing but when i see infopackage monitor the request is green.

 

 

When i see the infopacakge log in the process chain i see the following message. The load has started failing suddenly saying "last delta" not yet completed where as it has completed when i check infopackage monitor but the process is red in process chain. What is the reason. Please help

 

Diagnosis

 

 

     In the BW system there is no information from the source system. No

     Info-IDoc was found with an info status (rqstate) > 1 in the BI system.

     This at least confirms that the data selection was started.

 

 

     In this case, the BW assumes that the extraction process is not yet

     completed. The system is not in the position of determining whether or

     not the extractor in the source system has registered the request as a

     delta request or not.

 

 

     The request is set to  red  in the monitor, because the maximum wait

     time has already run out, after which the system valuated a request as

     being incorrect (the timeout time for  yellow ) .

 

System Response

 

 

 

 

 

 

Procedure

 

 

    If you are sure that the extraction process is completed and the request

    actually needs to be valuated as being incorrect, meaning it has to be

    set to  red , set this status manually in the monitor by using the QM

    action (tab page Status  -> pushbutton Total).

 

 

    Otherwise, search according to cause to see why neither Info-IDocs nor

    data are arriving in the BW.