Hello,
We have Upgraded our BW System to BW 7.4 SP9. We are not yet on HANA, as a new feature from BW7.3 onwards of Composite Provider, we are evaluating the use of Composite Provider in our landscape.
I checked few blogs wherein its mentioned that as a Pre-requisite to Create Composite Provider - BWA Accelerator is required.
We have BWA Accelerator in our Production System but not on our Development or Sandbox System.
Can anyone help me to know if its possible to Create Composite Provider without BWA Accelerator in Development/Sandbox and then transport the
Composite Provider to Production where we have BWA Accelerator.
Has anyone else faced the same issue?
Your help will be very much appreciated.
Thanks,
Sagar